Thursday, 18 January 2018

Second day of filming- Narrative

The second day of filming was located in a forest near the polo bridge in Kirkby-In-Ashfield. Before filming I had checked the weather to find Light rain and low temperatures, however because of all the trees I found that we didn't get hit by the rain. There were no props needed when filming apart from the narrative costumes. The only problem that I encountered was lighting as because I was using natural light it was a race against the clock in order to have the same lighting within every shot. I found that the last shots that I filmed had a cool blue tone to it because of the winter sun, however I found this extremely effective and decided that I would play around with colour correction whilst editing to create the same effect on all of my shots. 











No comments:

Post a Comment

A Level Music Video- Blasphemy